JOb Scheduling which need a change of date on parameter
Summary
how to do change the parameter date of the ESS job when we schedule itContent
we need to schedule a ESS job on daily basis
on parameter we have start date and end date which last week dates
when report is scheduled to run on daily basis
start date = less than 7 days of end date not possible to acheive.
end date -- sysdate is possible
any way to make change on the date parameters
available options
a week from today
specific date
Sysdate
Tomorrow.
any way we can do changes on the parameter dates please lets us know.
Tagged:
0