Hello all!
My client have about 35 Reports with grids and need to create 50 Report Packages whit long texts in Microsft Word (for each necessary Entity they need to export the reseults).
Is there a simple way to copy/paste a Report Package and change only the Entity in the refence doclet without doing one by one ? (Select the Reference Doclet->Act on content->Check out->Refresh->Change entity in POV->Check in)
Version (include the version you are using, if applicable):
21.09.61
Thank You!
Guido Zanella