When we run GOP for a make part , and the item is not available and we have the "check atp" and "atp component" set to "Material Only" , when GOP returns a date , does it look at the fixed and variable lead times set on the item or does it use the processing lead time setup on the item. The reason for asking this is that if the order quantity is 1 then going by either processing LT or (fixed + variable) LT will yield same results but if the order qty is say 2 then