Allocate Common Cost on Muliple Assets
Summary:
How to Allocate a task designated as a Common Costs "Grouping Level Type" on Multiple Assets.
Content (required):
Hi,
We Have 3 Tasks
1st Task is assigned with an asset
2nd Task is assigned with 2 assets
3rd Task is designated as a Common Costs "Grouping Level Type
--------------------------------
our requirment is to allocate costs of 3rd task on the three assets. how to do that?
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
0