Shrinkage Factor in cost rollup in Fusion Costing
Summary:
Shrinkage rate in cost rollup in Fusion Costing
Content (required):
We have shrinkage factor for an item 0.2 but when the cost is rolled up, it is not considering.
Example - 'AB' is the FG item. Component 'A' (qty1) has a shrinkage factor of 0.2 and cost is '$20'. Component 'B' (qty1) with cost as '$30'. Once the cost is rolled up for 'AB', we are getting the cost as '$50' so it is not considering the Shrinkage factor. Can you please advise ?
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
1