Cost Rollup-This level and Lower Level information

in Costing 11 comments

Summary:

Cost Rollup-This level and Lower Level information

Content (required):

We have the BOM as per following

Assembly --> 08891-0085-000-01

C1- 08888-0085-001-05

C2- 08888-0085-002-05

Labor (10 hrs)

When we rolled up the Cost, we are finding the cost of the components as 'this level' instead of 'Lower level'. Can you look into this