Project Budgetary Control Resource or Task level
Summary:
We need to prepare a demo for a customer who needs project budgetary control per task, which currently is not available. We thought that maybe we could assign a resource per task and set the control there, but our challenge is that we need to have the resources at item level and not at top resource. For example, they want a budgetary control for fridges and another one for stoves, both of them which are material items. Is there any work around or do you have any idea how we can showcase this?
Many thanks!
Content (required):
We need to prepare a demo for a customer who needs project budgetary control per task, which currently is not available. We thought that maybe we could assign a resource per task and set the control there, but our challenge is that we need to have the resources at item level and not at top resource. For example, they want a budgetary control for fridges and another one for stoves, both of them which are material items. Is there any work around or do you have any idea how we can showcase this?