NON Labor Rate schedule for actual costing, can it be set up at Project Level?
Summary:
We have the requirement of generating actual Cost for Non-Labor Expenditure type based on the Non-Labor Rate Schedule Schedule which will be set up by the team and is specific to the project.
Content (required):
Need to set up a specific Non-Labor Rate schedule for the projects not based on Org at Manage Organization Costing Rules to generate Actuals, but specific to projects which can be set up at project level.
Version (include the version you are using, if applicable):
21D
Code Snippet (add any code snippets that support your topic, if applicable):
0