How does Constrained Supply Plan work with multiple ranking sourcing rules?
Summary:
How does Constrained Supply Plan work with multiple ranking sourcing rules?
Content (required):
Let's Assume Demand is at Item1 and Org1. Sourcing Rule for the same is below:
Transfer from Org2 (Rank 1, Allocation%: 100)
Transfer from Org3 (Rank 2, Allocation%: 100)
Buy from Supplier (Rank 3, Allocation%: 100)
Onhand is available for Org3. Still those quantities are not pegged and all planned orders are generated for Org2.
Found below similar doc:
https://community.oracle.com/customerconnect/discussion/comment/630192#Comment_630192--> This suggests it should work.
FA: SCM: SCP: Constrained Planning Does Not Consider Rank 2 Source Even If Onhand Is Available at Rank 2 (Doc ID 2817461.1)
Tagged: