Summary:

In Refine Extract, we setup parameter basis as Post SQL Bind and Basis value as select sysdate-2 from dual. But when the extract is running, it is not calculating sysdate -2, rather the date is picked which was set at first run. Do we need any more configuration ?

Content (required):

In Refine Extract, we setup parameter basis as Post SQL Bind and Basis value as select sysdate-2 from dual. But when the extract is running, it is not calculating sysdate -2, rather the date is picked which was set at first run. Do we need any more configuration ?

Version (include the version you are using, if applicable):