Forecast: Budgetlines build from Actuals are not burdened
Summary:
We have generated a forecast and lines are automatically entered from actuals. However these lines are not burdened. If I manually add a line with similar resource details those are burdened:
Top line is manually added and the lines below are generated.
Content (required):
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
0