Charge overheads based on work center or plant overhead for maintenance work orders
Summary
Overall Business Case
- We need to charge overheads based on work center or plant overhead for maintenance work orders
- Expected distribution is expected to be same as resource (labor) costs
Credit – Overhead Absorption (expense pool)
Debit (Maintenance Expenses)
Content (required):
- These expenses then like labor or material costs should be pushed to depot repair charges as we will bill the customer based on a fixed-up markup on overall costs incurred by us to repair ( which is material + Labor + overhead). In this case how overhead expenses are expected to map
Current Observed Behavior
- Inspite of overheads being setup with standard overhead rate for work center / plant overhead , cost accounting does not apply overheads