Costing Method based on Item
Summary:
Content (required):
Hello Experts
We are live with Oracle Cloud with Standard Costing Method.
Now we are thinking to use Landed Costing Method for few Items. we already have standard cost defined for those.
Is that possible to use Landed Costing based on Item?
Do I have to switch the costing method for those items as "Actual"?
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0