Calculated item for Actual Time spent in Learning
Summary:
Content (required):
Hi there, the actual time spent for a learning item is measured in 0.5, 0.75, etc. We want to prepare a calculated item column in OTBI report that would translate the 0.5 to 30m, 0.75 to 45m, etc. How is this done?
Thanks in advance
Bobby
Version (include the version you are using, if applicable):
22D
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0