Is there a way to perform billing calculations using the contracts module without project module ?

Accepted answer
4
Views
1
Comments

**This post was created as part of a How to Service Request (SR)


Release:

[23A]


Summary of the question:

Is there a way to perform billing calculations (with fee) using the contracts module itself, or if there is a way to perform this calculation without using the project module?


For example, to have an automatic calculation to convert the rate according to each unit like:

Fee: 40.00

Unit: 10

Contract line price value: 400.00

That is, when billing is using this rate, the system needs to automatically perform the above calculation.


The only way to do this calculation was through the "Manage Rate Schedule" functionality that is in the project module, according to the material below available on the Oracle portal: