Enabling Project Driven Supply Chain (PDSC)?
Summary:
In EBS Project Manufactuing (PJM) could only be enabled in a newly created inventory org, i.e. one in which no master or transactional data has been created. Can one enable PDSC after an inventory org has been used or is the restriction the same as with EBS PJM?
Content (required):
Version (include the version you are using, if applicable):
22D (11.13.22.10.0)
Code Snippet (add any code snippets that support your topic, if applicable):
0