Bug in ODI scenario scheduling with Log Level 6
Organization Name (Required - If you are an Oracle Partner, please provide the organization you are logging the idea on behalf of):
Oracle GSC
Description (Required):
When a Refresh variable with current_date function is used in a scenario and that scenario is schedule with log level 6, the refresh variable is taking the earlier value rather than the latest refreshed value. This peculiar case has been observed when that variable value is stored in an audit table and is being used as the last extraction date.
This is not happening when we execute the scenario with log level 5 or do a manual execution.
13