How to enable the measure Gross Requirements in supply plan tables like Material Plan

Summary:

We are unable to find the measure Gross Requirements to add to our custom Material Plan tables .

Content (required):

Does the measure Gross Requirements exist to be enabled in supply plan tables?

As per 2672548.1 :

Projected onhand(POH) = Previous Bucket POH + Onhand + Scheduled Receipts - Gross Requirements

We are able to find scheduled receipts but not gross requirements. Even tried under configure planning analytics but cannot find this measure.

Version (include the version you are using, if applicable):

22D

Code Snippet (add any code snippets that support your topic, if applicable):