How to copy a measure value from a plan to other
Summary:
I'm trying to copy a measure from one plan to another and I can't
Content (required):
Version (include the version you are using, if applicable):
B22
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0