Enabling 2 nspection plans for singe PO receipt.

Received Response
21
Views
1
Comments
edited May 5, 2023 10:22AM in Quality 1 comment

Summary:

As per requirement we need to enter quality results against 2 Inspection Plans for a single PO reciept for a particular Item. One Inspection plan with Level set as “General Inspection Level” and the other set as “Special Inspection Level” and both Inspection has to be done in Succession one after another for a single receipt. 

Content (required):

Suppose, I have a plan called 'MECH Visual Inspection Plan' with “General Inspection Level” for an item Catalog Category say 'Quality Catalog & Mech.visual as Category. Now we need to have another plan say 'MECH-Special Inspection plan' with 'Special Inspection Level' for the same catalog Category so that whenever there is a PO receipt inspection system should ask me to enter results for both the plans according to the sampling logic. Any Idea how we can achieve this?