Is there any option assign resources on project plan with no effort/duration/allocation control?
Summary:
Option to avoid allocation/effort/duration constraint
Content (required):
The customer would like to assign labor effort for a specific resource on project plan tasks without having a constraint fixed duration or a fixed effort calculation, without a constraint between allocation/duration/effort
Version (include the version you are using, if applicable):
23B
Code Snippet (add any code snippets that support your topic, if applicable):
0