Get Started with Redwood for Oracle Cloud HCM Begin Now
we have a matrix manager type called BPFM. How can we make sure the BPFM is one per assignment
Summary: We have created a matrix manager type called business process flow manager (BPFM). So we need the same setup as line manager where when a manager is already added and if we add 2nd line manager - system will throw an error stating only 1 line manager per assignment.
I want the same setup for BPFM as well.
Content (required):
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0