To not allow WO completion without Manual Report Required
Summary:
Hi Expert
when Manual Report Required in the production process on the Dispacth list the system allows to do completion to the WO althogh the Manual Report Required dosen't done.
It can makes that if forgotten to report the push component in the Manual Report Required then the WO can be completed without issue the push materials.
do we have an option to not allow complete the WO if Manual Report Required doesn't full done.?
BR
Sassi
Content (required):
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0