How to Capture Total cost for asset while creating and assigning cost using ADFDI or FDBi
Summary:
As part of conversion activity we will be loading WIP Projects along with the respective assets assigned to the tasks or project. We are planning to use Create and Assign Assets in Excel-ADFDI or Import Asset and Assignment Process - FBDI spreadsheet for loading and assigning assets. We see all possible fields except for Total Actual Cost for the asset which is actually required to capture the asset cost.
Content (required):
As part of conversion activity we will be loading WIP Projects along with the respective assets assigned to the tasks or project. We are planning to use Create and Assign Assets in Excel-ADFDI or Import Asset and Assignment Process - FBDI spreadsheet for loading and assigning assets. We see all possible fields except for Total Actual Cost for the asset which is actually required to capture the asset cost. How do we capture actual cost for the asset in ADFDI or FBDI directly rather than first creating and assign assets and then capture costs separately.