how to process 0 cost in costing module for period cost (Actual cost is implemented)?

Summary:

The user had uploaded the transaction with a 0 value and then used the same item in different inventory transactions. during the period of close activity same transaction got stuck as there is no layer cost for the same. how to resolve this in bulk

Content (required):

The user had uploaded the transaction with a 0 value and then used the same item in different inventory transactions. during the period of close activity same transaction got stuck as there is no layer cost for the same. how to resolve this in bulk