Date Data Type in Inspection Characteristics
Summary: Unable to use Date Data type in Inspection Characteristics
Content (required): We are required to use Date field in all our Quality Plans. Along with Date we use Character and Number.
For Number we have specified the specification and Inspection result will return Green Check if the Quality result is entered within the given specification.
We have defined Date field also and provided the Min Value as 01/01/2020 and Max Value as 01/01/2090.
During the Inspection i have entered 01/01/2021. Inspection result falls under the given range and i am expecting green check mark beside the user entered value just like Character and Number Data types.
Tagged:
0