Need to change "Capitalizable = No to Capitalizable= Yes" as this cost is not being captured as part
Summary: How to change cost to Capitalizable = Yes after it has been captured in the PPM
Content (required): Project Costing
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0