Derive job cost rate from resource class type
Summary:
How to derive job cost rate from resource class type on rate schedule for import cost process
Content (required):
we want to assign rate schedule type to resource class so we don't need to add the rate per job one by one, please guide me how to assign rate for unprocessed costs so that they refer to the rate schedule with the schedule type Resource class, not refer to schedule type job.
Tagged:
0