Process Manufacturing Work Order Is Not Getting Costed: The Transaction Can't Be Processed
Summary:
Process Manufacturing Work Order Is Not Getting Costed: The Transaction Can't Be Processed Because A Standard Cost Is Missing. Cost Method Is Average Or Actual.
Content (required):
The product completion transaction that has a fixed cost allocation factor wasn't processed because the standard costs are missing.
But the Cost method for the item is Average and we don´t have standar cost for this item, Is there any workaround to solve this?
Version (include the version you are using, if applicable):
23B (11.13.23.04.0)
Code Snippet (add any code snippets that support your topic, if applicable):