How to exclude rejected Requisition in the computation of the Project Committed Cost?
Summary:
Content (required):
We noticed that rejected PRs are still captured in the Manage Project Committed Cost.
Is there a way that those be excluded?
Version (include the version you are using, if applicable):
Oracle Fusion Cloud Applications 23C (11.13.23.07.0)