[Pipeline]. Dimension Load Fails With the Error
Summary:
[Pipeline]. Dimension Load Fails With the Error.
PositionCode, Reason: EPMFDM-ERROR: {Month#Year} notation for Start/End period is not supported for Dimensions load
Pipeline has substitution variables listed on Variables page:
$IMPORTMODE set as &CZR_FTE_Period#&CZR_FTE_Year
$EXPORTMODE set as &CZR_FTE_Period#&CZR_FTE_Year
These variables work for data load but not for metadata load. Is there a way to use subvars with metadata loade?
Content (required):
[Pipeline]. Dimension Load Fails With the Error.
PositionCode, Reason: EPMFDM-ERROR: {Month#Year} notation for Start/End period is not supported for Dimensions load
Pipeline has substitution variables listed on Variables page: