How to raise Absence for calendar events days?
Summary:
A qualification absence plan has been set up to enable employees to schedule absences using Calendar Events.
Within this plan, absences can commence and conclude on specific Calendar Events. However, it's important to note that weekends should not be counted as part of the absence duration.
For instance, consider the scenario where two bank holidays, namely September 4th and September 20th, have been configured as Calendar Events for the month of September. If an employee wishes to schedule an absence from September 4th to September 20th, including these dates, the application should permit the booking of this absence while ensuring that weekends within this timeframe are not considered part of the duration.
Tagged:
0