Unable to setup Resource overhead based on Resource Cost
Summary:
Hi All,
1.we have a requirement from client to setup Resource overhead based on Resource transaction.
2.Option for setting up Resource overhead based on Resource cost is not available in Manage Accounting Overhead Rules.
3.Costing method used is Average costing.
Can you please confirm if Functionality exists for Resource overhead to be calculated on Resource cost basis.
Example: Resource cost is 10 USD and Overhead resource needs to be set as 20 %, So system should derive 2 USD as Resource overhead cost.
Thanks,
Mangesh
Content (required):
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0