Linking Absence Types
Summary:
Linking Absence Types
Content (required):
We have two absence types "Vacation Leave" and "Extended Leave". Incase say 3 weeks of extended leave is availed by employee , the same 3 weeks need to be reduced from his vacation leave balance.
Can I know if this can be achieved in the system , any insights are appreciated.
-RKC
Version (include the version you are using, if applicable):
23B
Code Snippet (add any code snippets that support your topic, if applicable):
0