Overhead charge at each operation instead of work order product completion

edited Sep 27, 2023 9:58AM in Costing 1 comment

Summary:

Overhead to the Work order can be charged at the end of each operation?

Content (required):

We are using costing method as standard cost. For Make items we have defined an overhead cost element and Overhead rates as 8% on each resource.


The work order has got multiple operations and overhead charge is getting applied to the work order only completion of the work order. So requirement is to have an option to apply Overhead at each of the work order operation.


Please let us know if the overhead to the WO can be charged at the end of each operation.