inspection action Status change to Quarantine failed.
A plan for inspection has been established, along with the action rule aimed to modifying the material status of the Lot.
Upon completion of the inspection, the Lot status remains unaltered.
In the manage inventory organization parameter the (allow different lot statuses assigned to Yes)
The inspection action results completed with the following message: "status change to rejects failed."
Is it required to utilize an API to implement this action?
Tagged:
0