Category 165
Discussion List
-
Is it possible to create an inspection plan without Target field for numeric charactersSummary: Dear Experts, My client doesn't use target field but only minimum and maximum limits for numeric characters. Target is a mandatory field currently while creatin…
-
How to create Receiving Inspection and update Sample Result in Quality using Rest APIsSummary: We have to load the Receiving Inspection from legacy system. Can you please provide white paper or videos links for this activity. We have created Receiving Ins…
-
Inspection characteristics mass translationHi everyone, In Quality Management, we would like to translate inspection characteristics. I understood that this can only be done through the UI by logging in using the…
-
How to user REST API copyPlan to copy quality management inspection plan?Manufacturing>Inspection Plans>copyPlan /fscmRestApi/resources/11.13.18.05/inspectionPlans/{InspectionPlanId}/action/copyPlan How to use copyPlan to copy a plan to anoth…
-
Modification of Inspection FYI Standard NotificationSummary: Any possibility to do modification on Inspection FYI Standard Notification ( i.e. Inclusion of Quantity, Inspection Plan etc.) Content (please ensure you mask a…
-
How can I query the eSignature record associated with a specific Quality Inspection record?eSignature is required for 'Quality Inspection Disposition'. Once an eSignature record is generated with approval of an Inspection (Receiving, Inventory or WIP Transacti…
-
Grower ManagementSummary: Are you interested in having Grower Management available for Oracle Fusion Applications? If you were using JDE, you probably know this functionality is not avai…
-
Quality Management copyPlan RESTAPI error 403 forbiddenSummary: With my existing roles, I can do the copy plan in the screen and also can run the RESTAPI to get all inspection plans. But I don't know which seeded roles shoul…
-
Cloud: don't want eSignature to require a code to phone/email when Oracle Authentication is activeSummary: We are a medical device company under 21 CFR Part11. When a Quality Inspection is submitted for eSignature approval, username and password are required, this is…
-
How to display the quality issues created against the work order in the work order screenSummary: Hi Team We need to display the quality issues associated with a work order directly on the Work Order screen. If anyone has come across similar business require…
-
How to enable 'skip quality inspection' during inspect receipts?Hello All, We have a requirement to enable the 'Skip quality inspection' during inspect receipts. Can anyone tell me how to enable this feature? Regards, Sarthak
-
Quality inspection value matches specification but rejected anywaySummary: Inspection value for a characteristic matches specifications of the inspection plan. But it is rejected. Content (please ensure you mask any confidential inform…
-
Inspection for finished good after Work in process completedSummary: Content (please ensure you mask any confidential information): Version (include the version you are using, if applicable): Code Snippet (add any code snippets t…
-
Define New Target Attribute Reference for Inspection CharacteristicsHi, I have read through Oracle's documentation Inspection Characteristics several times and cannot find where to associate a new Value Set with the Target Attribute Refe…
-
Need some more details on Item Based Inspection CharacteristicsSummary: As per documentation for Item Based Inspection Characteristics -- 'You can link item-based inspection characteristics with attribute values in an item class. Th…
-
I Need a Report of All Existing (Active and Obsolete) Inspection PlansSummary: We have a business need to view all of our existing inspections plans, whether they have been used or not. We are not looking for quality events, we are looking…
-
Sample (Inspection) sequence number is not uniqueSummary: Sample (Inspection) sequence number need to be a unique Content (please ensure you mask any confidential information): When I am trying to draw Inventory sample…
-
What controls the order of the list of values for a quality inspection characteristicSummary: We have list of values on a non-item quality inspection characteristic that are setup as Pass, Fail, and N/A. These values are added to the quality inspection c…
-
Ability to make bulk status changes to NCs (Quality Issues)Hi We need to update the status of Non-conformances/Quality Issues in bulk. Could you please let me know if there's a simple way to do this? Thanks Boobalan.A
-
Why skip lot forces to use Inspect and submit in Inventory for the Lots getting skipped?Summary: Items enabled for Skip lot: a) PO created and received b) first time, it goes for Inspection. Item inspected and entered quality results. completed putaway c) s…
-
Which are the tables or views behind Quality Action Rules?Summary: Hi Team, We need to know the table/view which are storing the data for Quality Action Rules that are being created from UI. Content (please ensure you mask any …
-
User is not able to search or select any item while creating Inspection Plan.Hello, While creating Inspection plan in redwood UI user is not able to see any item in LOV or by manual search user is not able to find any item for a particular Org. W…
-
What the max length is for 'list of values' of 'Character Type' inspection characteristics?Summary: Dear Experts, Would like to know what the maximum length is for 'list of values' of 'Character Type' inspection characteristics? We need to create Inspection ch…
-
Create Maintenance Work Order from Inspection Plan Action RuleNeed to create a maintenance work order from inspection plan as per following: Insert condition = Any characteristic is out of specification. Insert action = Create a ma…
-
Quality Inspection Approvals : "First Responder wins" scenarioSummary: We have a requirement for inspection Approvals as below: We have an approval group for an organization (it has 3 members) Requirement: The requirement is for th…
-
How to change the name of existing characteristic or create a new characteristic with same name?Summary: Dear Experts, Would like to know if we can Create two characteristics of same name but of different data type. One with type 'Number' and other with type 'Chara…
-
-
what does it mean: the approval (ERES) is in-line?Hello, can you please give me additional info regarding this?
-
Is there any functionality to capture the quality samples during production process?if not, is there any workaround? Thank you
-
Mandatory attachment for a characteristic while entering inspection resultsSummary: While entering inspection results for a quality inspection, is there a way to make attaching a file mandatory for a specific characteristic while entering resul…