Ad-hoc Inspection Not Honoring Sampling Rules(Inspection Level) for Items (WIP)
in Quality
Does Oracle Quality's ad-hoc inspection functionality support automatic calculation of a sample size based on an plan's inspection level and a given total quantity? If so, what is the correct process or configuration to achieve this?
Scenario Details
- Module: Oracle Quality in Oracle Fusion Cloud.
- Process: Ad-hoc inspection.
- Inspection Plan: Type is set to "Work in Process".
- Inspection Level: A fixed percentage (e.g., 10%) is defined and assigned to the item.
- Process: We are attempting to perform an ad-hoc inspection on a completed work order with a total quantity of 10 assemblies.
Expected vs. Actual Behavior
- Expected Behavior: When creating the ad-hoc inspection and providing the work order/operation details, the system should recognize the total quantity of 10. Based on the 10% inspection level, we expect the system to automatically calculate the sample size as 1 and only require us to enter quality results for that quantity.