Is cumulative manufacturing lead time supported for ATO model items?

edited Oct 16, 2023 1:35PM in Manufacturing 3 comments

Summary:

We have configured an ATO model item with structure and work definition.

We tried to calculate the lead times by running scheduled process "Calculate Lead Times and Roll Up Cumulative Lead Times"

However, in the ESS process scope, if we select cumulative manufacturing lead time, the include ATO model option is automatically going into "no" which is not editable. When we run the process with scope as manufacturing lead time and include ATO model option as "yes", it runs successfully and calculates fixed, variable and processing lead times for the ATO model. However, the cumulative manufacturing lead time is not calculated.