Work Order entry based on 6AM-6AM Calender
Summary:
Our Manufacturing Plant has 24-Hour Shift based on 6AM-6AM format. They are working on 3 Shifts in the 6AM-6AM Format.
Hence during the last Shift (which falls in 12AM-6AM Time frame) any updates on Work Order (Work Order Creation, Update or Closure) gets incorporated in next day due to Oracle taking Day format as 12AM-12AM.
Is there a way we can incorporate 6AM-6AM format (which the Plant uses in real day-to-day operations) in Oracle Fusion; so that when the Plant operates in their shift any updates on Oracle Fusion in their Last Shift (12AM-6AM) gets taken in the same day.
Tagged: