Outside Processing Cost in separate Cost Element of Item Cost (Fusion)
In EBS, for an Item, am able to see Item Cost with Outside Processing as one element under Item Cost.
In Fusion, is there a way the Outside Processing Cost can be attached to the Item Cost as part of the Work Order process, under a separate Cost Element called OSP. Currently, by default it is going under Material Cost head.
Attaching EBS screenshot for reference.
0