Outside Processing Cost in separate Cost Element of Item Cost (Fusion)

edited Jan 11, 2024 5:24AM in Costing 7 comments

In EBS, for an Item, am able to see Item Cost with Outside Processing as one element under Item Cost.

In Fusion, is there a way the Outside Processing Cost can be attached to the Item Cost as part of the Work Order process, under a separate Cost Element called OSP. Currently, by default it is going under Material Cost head.

Attaching EBS screenshot for reference.