How is the cost change value calculated in the Review Item Cost screen
Summary: Hello Oracle Experts! Our client is following the perpetual average costing method. How is the cost change value calculated in the Review Item Cost screen, I was under the assumption, it is the difference between the current unit cost and the previous unit cost, but when I checked it is not calculated that way.
In the below screenshot, the current unit cost (avg.cost) is 23, but the cost change is shown as 25.52. I have also attached the past transactions for the same item. Kindly help!
Content (please ensure you mask any confidential information):
Version (include the version you are using, if applicable):
Tagged:
0