Issue with Attachments in 'Review Dispatch List' for Inspections
Summary:
Hello experts,
I have a question regarding reporting an 'inspect' through the 'Review Dispatch List.'
The question relates to the behavior of attachments.
I am attaching a document in one of the inspections at the inspection level and expect to see it in the next station.
Currently, I have two issues:
1. The document does not transfer to the next station.
2. Even when I attached the document, through 'Quality -> review inspect,' the document appears, but there is no indication, such as a change in form, that there is an attachment in the inspection.
Quality :
Thank you.
BR
0