Load Assignment
Hi,
We would like to know
- As per existing configuration OBLPN is assigned to the load when it is picked,moved to drop location and status changes to Packed. We want the load to be assigned to after it is picked and re-packed.
What configuration changes needs to be done.
Tagged:
0