How to model this scenario in Discrete Manufacturing?
Summary:
We have a doubt regarding WO Execution and traceability.
We want to cut a 6mt pipe to produce
4*1mt pipes and 1* 2mt pipe
But we also want to assign a serial number to each piece, how can this be achieved in Oracle Manufacturing Cloud
Content (please ensure you mask any confidential information):
We have a doubt regarding WO Execution and traceability.
We want to cut a 6mt pipe to produce
4*1mt pipes and 1* 2mt pipe
But we also want to assign a serial number to each piece, how can this be achieved in Oracle Manufacturing Cloud