Manage Overhead Rate by Work Center in Average Cost Method
Summary: The overhead rate by work center can be utilized in standard costing. However, according to the information provided in the following link, it appears that we cannot define overhead rates by work center in the average cost method. Is this correct? Are there any workarounds?https://www.oracle.com/webfolder/technetwork/tutorials/tutorial/cloud/r13/wn/inv/releases/24A/24A-inventory-wn.htm#T53151
Version (include the version you are using, if applicable): 24A
Code Snippet (add any code snippets that support your topic, if applicable): https://www.oracle.com/webfolder/technetwork/tutorials/tutorial/cloud/r13/wn/inv/releases/24A/24A-inventory-wn.htm#T53151
Tagged:
0