The way to change Build Status from Active with unbuilt changes to Active in Burden Schedule.

Summary:

Do you know the way to change Build Status from Active with unbuilt change to Active in Burden Schedule.

I taked the following steps.

1.Set Burden Schedule.

2.Click Buile Burden Schedule. At this time Built Status was change to Active.

3.Edit Burden Schedule. At this time Built Status was change to Active with unbuilt changes.

4.Click Buile Burden Schedule. At this time Built Status was not change to Active.

I thhought it came to be Active status when I take step4 but it to be not so.

How do I change to Active status from Active with unbuilt changes?