Match configuration in item structure
Summary:
We have integration from CPQ to OM Fusion (standard) to create orders for CTO items. However this integration is failing in a scenario where the Manufacturing BOM is exactly same but the Manufacturing Instruction (Polarity in this case) is different 2 star parts.
Attributes (Polarity) selection in CPQ configuration leads to a star part number (X) creation along with BOM (BOM123).
If a selection criteria is changed from A to B, CPQ logic creates a new star part number (Y) with the same manufacturing BOM (BOM123).
But the CTO star part number Y is not getting created in PDH (through OM to PDH standard integration) since the BOM (BOM123) is similar for both the items(X and Y) as Star Item X already exists in PDH.
0