Our company uses the PAC method, and we need to use the current period cost for internal material transportation instead of the prior period cost.
This is a critical issue with the current functionality of Oracle Fusion that directly impacts our business operations. As a group with operations in over 6 countries, it is essential that our systems fit seamlessly into our workflow. Unfortunately, the current functionality in Oracle Fusion is not compatible with our processes at all.
This discrepancy in the cost calculation methodology is significant enough to potentially delay the launch of the Fusion project unless it is corrected urgently. We urgently need to update the costing method to utilize "current period cost" instead of "prior period cost".