Does View Cost Rollup provide a facility to see the cost computed for This Level & Previous Level
Summary:
After we roll up the cost in standard cost, the cost rolled up can be seen in “View rolled up Cost” UI. When the UI is searched for the roll up cost, we can see the cost for the Assemblies that are rolled up during the process. The rollup view shows the cost for Material, Resources, Overhead, and Extended Cost for the Assembly. It also shows the cost contribution from the subassemblies and components of the Assembly. However, I am unable to find how to view the cost contributed by material from “This Level” & The Previous/Lower level for the
Tagged: